[1]
F. Jonathan and S. M. Damayanti, “Investment Modeling Algorithm for the 50 MW Sumbawa 3 Gas Engine Power Plant (PLTMG) Project: A Correlation-Aware, Risk-Adjusted Feasibility Framework”, MALCOM, vol. 6, no. 3, pp. 1724-1743, Aug. 2026.