[1]
Jonathan, F. and Damayanti, S.M. 2026. Investment Modeling Algorithm for the 50 MW Sumbawa 3 Gas Engine Power Plant (PLTMG) Project: A Correlation-Aware, Risk-Adjusted Feasibility Framework. MALCOM: Indonesian Journal of Machine Learning and Computer Science. 6, 3 (Aug. 2026), 1724-1743. DOI:https://doi.org/10.57152/malcom.v6i3.2849.